1、在搭建升降舞臺http://www.s8309.cn/之前可以先在地面上大致位置擺好兩個支腿,把兩側的斜拉桿插到支腿舞臺機械上面的銷子里,別上止回閥。
Before landing stage can be set up on the ground gracefully approximate location two legs, put both sides of the rod into the pin yard slant leg stage machinery above, do the check valve.
2、把升降舞臺臺框扣到支腿上面的U槽里,在并排著放一條支腿。
The landing stage sets box buckle to the U groove in the leg above, put one leg in side by side.
3、用兩套斜拉桿和原來的支腿連接上,則這條支腿就被固定上了,再把臺框鋪上,兩個臺框共用中間的一條支腿,兩個臺框都放到了U槽里面。
With two sets of oblique rod and legs on the original connection, then this would be fixed on the legs, and then sets the box covered two sets of boxes share a middle leg, the two sets of boxes are placed in the U slot inside.
4、以此類推可以無限延伸,下一列以同樣的方式靠緊組裝。
And so can be infinitely extended, the next column in the same way try to be assembled.
公司名稱:濟南液壓升降機械銷售中心
聯系人:安經理
電話:152-5313-4653
郵箱:347299818@qq.com
網址:www.s8309.cn
地址:山東省濟南市濟北開發區
手機移動端
微信掃一掃